The work on the outside of the elevator enclosure has been completed and the construction equipment has been removed. The door to the waiting area has been installed in anticipation of the first rider.
Tuesday, January 29, 2013
Friday, January 25, 2013
Almost Ready to Ride
Friday, January 11, 2013
Assembly Time
If you ever had trouble assembling a book case from Target, these photos may cause you some stress. Thankfully, professionals are on site taking care of this.
![]() |
| Elevator call buttons for outside, Main Floor, basement, and Reference. |
![]() |
| This..um...thingie has something to do with running the elevator. |
![]() |
| Outside elevator entrance is now framed. |
![]() |
| Elevator control panel. |
Friday, December 21, 2012
Christmas Present: Elevator Parts
Parts of the elevator were delivered today. No need to worry: professionals will be doing the assembly.
Monday, December 17, 2012
Getting Ready on the Inside
In this video you can see the removal of the former handicapped access door. The interior is being prepared for the installation of the elevator coach in January.
Thursday, December 13, 2012
!CAUTION! HOLE
Here's a simple formula: take a newly constructed elevator shaft and add in an elevator carriage that has not yet been delivered and you get.....
Tuesday, December 11, 2012
Just Waiting for Riders
Work was recently done on the sidewalk around the elevator entrance. It now looks like you can walk right in and take a ride, but we just have a little longer to wait. We expect the elevator coach to be delivered on Christmas Eve. The month of January will be spent assembling, installing, testing, and certifying the coach. We hope to open the doors to our first riders just before February 1st.